Tags : how much
What is the process of development permission in Japan?
2021年3月5日 CivilEngineering
In Japan, when it comes to a building construction, there are two major building permissions to be considered. 1 Land development permission and 2 Building permission. No 1 is required for the land with more than a certain size however, No 2 is required for the most of buildings. For the large size of land, …